Tongji University’s Hybrid Tendons Revolutionize Bridge Design

In the ever-evolving world of bridge construction, a groundbreaking study led by Zhichao Wang from Tongji University Architectural Design (Group) Co., Ltd., Shanghai, China, is set to revolutionize the way engineers approach prestressing tendons in bridge design. Published in the prestigious journal ‘预应力技术’ (which translates to ‘Prestressed Technology’), Wang’s research delves into the intricate world of hybrid internal and external prestressing tendons, offering a fresh perspective on optimizing bridge construction and maintenance.

The study focuses on a novel design scheme that leverages both internal and external prestressing tendons, each playing a crucial role at different stages of the bridge’s lifecycle. Internal tendons take the lead during the cantilever casting construction phase, bearing the initial load. As the bridge progresses to the service stage, external tendons step in to handle the superimposed dead load and service load. This strategic arrangement not only enhances the bridge’s structural integrity but also simplifies inspection and replacement processes for the external tendons.

Wang’s research highlights the significance of different tendon arrangement schemes, which can dramatically impact the layout and number of internal and external prestressing tendons. “The key is to optimize the tendons during the construction process,” Wang explains. “By ensuring that internal tendons bear the load during construction and external tendons handle the superimposed dead load and service load, we can achieve a more efficient and durable bridge design.”

The implications of this research are vast, particularly for the energy sector. Bridges are critical infrastructure for transporting energy resources and connecting power grids. A more efficient and durable bridge design means reduced maintenance costs and increased longevity, which can significantly impact the energy sector’s bottom line. Moreover, the ease of inspecting and replacing external tendons can lead to safer and more reliable bridges, ensuring uninterrupted energy supply chains.

Wang’s study provides a comprehensive design process that can serve as a blueprint for similar prestressed continuous girder or continuous rigid-frame bridges with hybrid tendons. This research is poised to shape future developments in the field, encouraging engineers to adopt more innovative and efficient prestressing techniques. As the demand for robust and sustainable infrastructure grows, Wang’s findings offer a promising path forward, ensuring that bridges not only stand the test of time but also adapt to the evolving needs of modern society.

Scroll to Top
×