Madura Island Study Reshapes Labor Productivity in Energy Infrastructure

In the heart of Indonesia’s Madura Island, a pressing question looms over the construction industry: how can labor productivity be optimized during the challenging tobacco plantation season? Agus Hendrianto, a researcher from Universitas Madura, has delved into this very issue, publishing his findings in the *Journal Innovation of Civil Engineering* (translated from Indonesian as *Journal of Civil Engineering Innovations*).

Hendrianto’s research focuses on the construction of Fc’ 25 Mpa Wiremesh Cement Concrete Pavement (M8), a critical component in road improvement projects. His work reveals a fascinating disparity between actual labor productivity and the estimates provided by the Indonesian Ministry of Public Works and Housing’s 2022 AHSP Bina Marga guidelines.

In the Karang Dalem – Patarongan Road Improvement project, for instance, Hendrianto found that foremen achieved 30.77 m3/OH, while workers reached 30.81 m3/OH. These figures contrast with the AHSP Bina Marga 2022 estimates of 20.75 m3/OH for foremen and 33.43 m3/OH for workers. “This discrepancy suggests that our current guidelines may not fully account for the unique challenges and advantages present in specific regions and seasons,” Hendrianto explains.

The study highlights several obstacles that hinder productivity during the tobacco growing season, including scorching weather, labor motivation issues, and the distance of casting suppliers from project sites. These findings are not merely academic; they have significant commercial implications for the energy sector, which relies heavily on efficient infrastructure development.

Hendrianto’s research could shape future developments in the field by prompting a review and potential revision of the AHSP Bina Marga guidelines. “By understanding and addressing the specific challenges faced during the tobacco plantation season, we can enhance labor productivity and ultimately drive more efficient and cost-effective construction projects,” he asserts.

The energy sector, in particular, stands to benefit from these insights. As the demand for energy infrastructure grows, so too does the need for optimized construction processes. Hendrianto’s work serves as a reminder that one size does not fit all, and that local context matters greatly in the pursuit of productivity.

As the construction industry grapples with these challenges, Hendrianto’s research offers a beacon of hope, illuminating the path towards more productive and efficient project implementation. His work not only contributes to the academic discourse but also provides practical solutions that can be implemented on the ground, benefiting both the construction industry and the energy sector at large.

Scroll to Top
×